
Since 1980
Erection, commissioning and operation specialists for the raw materials industry
When a plant is being built, restarted or pushed back to capacity, the people on site decide the outcome. AIC has supplied those people since 1980 — supervisors, engineers and control room operators, on site in 55 countries.
1980
Year established
600+
Sites worked on
55
Countries of assignment
11
Workforce nationalities
We do not build plants.
We staff them.
Most of our clients can build a cement line. What they cannot always do is put a refractory supervisor in Kazakhstan in eleven days, or find a CCR operator who has run this exact kiln configuration before.
That is the gap AIC fills. We are not an EPC contractor and we do not compete with one. We supply the specialists that owners, contractors and equipment manufacturers need on site — for a commissioning window, a shutdown, a full erection phase, or a permanent position.
Industries
Five fields, one set of disciplines

Cement
Erection, commissioning and operation of complete lines, from crusher to packing plant. Our longest-standing field, including niche applications such as white cement.
Read more
Minerals
Mining engineers working exclusively on vertical roller mills, horizontal mills, crushers and conveying systems.
Read more
Steel
Personnel to manage the setup of the production process. Service work limited to roller presses, ESPs and refractory.
Read more
Petrochemical
Operator training and welding supervision, plus senior supervisors for installation work.
Read more
Filters
Electrostatic precipitators, hybrid systems and baghouses. New installations and retrofits to meet tightening emission limits.
Read more- Request personnel
Not sure which applies?
Most sites cut across more than one of these. Tell us the equipment and the phase — we will tell you who we would send.
Services
Across the whole project life cycle
01
Planning
Project consulting, market studies, scheduling, staffing. Before the first foundation is poured.
Read more02
Erection & commissioning
Site supervision, mechanical and electrical works, auxiliary equipment, start-up. The phase where delay costs most.
Read more03
Operation
Staff training, process optimization, maintenance, upgrades, spare parts. After handover, when the plant has to earn its money.
Read more

CCR operation
Someone has to run the line while your operators learn it
We supply control room operators who take over the desk on a new or restarted line. They run it, and they train the client’s own operators while doing so. On a new plant this shortens ramp-up considerably; on a restart it prevents the trial and error that damages equipment.
Process engineering & CCRFields of work
Twelve disciplines, staffed by people who have done the job on a live site
- Mechanical engineering
- Electrical engineering
- Process engineering & CCR operation
- Civil engineering
- Site management
- Commercial site management
- Refractory
- Claims management
- Quantity surveying
- Planning & scheduling
- Spare parts
- PLC commissioning & programming
Cement & minerals
- Kilns
- Vertical roller mills
- Horizontal mills
- Coolers
- Crushers
- Cyclone preheaters
- Packing plants
- Roller presses
Steel & petrochemical
- Welding
- Piping
- Roller presses
- Refractory
All industries
- PLCs
- Electrostatic precipitators
- Refractory
- Civil works
Refractory
The worst conditions on site, on the critical path
Refractory work happens hot, confined, and usually during a shutdown that cannot be extended. Our supervisors are used to working to a fixed window with a crew they did not hire.
Refractory services
Clients
Who we work for
Our clients are plant owners, EPC contractors and equipment manufacturers. Most of our contracts include confidentiality clauses, so we do not publish client names or logos. What we can say:
- DAX-listed groups
- 4
- Major EU index listings
- 2
- State holdings
- 2
A detailed reference list, including letters of appreciation, is available on request.
Example quotes below — pending real, cleared client statements
"The supervisor was on site within eight days of the request."
Project Manager, Tier-1 cement producer, GCC
"Our kiln was back on line on the date we had set before the shutdown began."
Site Manager, cement plant, Southeast Asia
"They found us a white cement specialist in under two weeks — a skill set we could not source ourselves."
Project Director, EPC contractor, Europe
Tell us what the site needs
Discipline, equipment, project phase, location, start date and duration. From that we can usually tell you within a working day whether we have the right person and when they are free.